PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Conitnued prepping the slab on grade Facing North-West (800x600).jpg Continued fixing and welding the main steel column at the Monumental Stairs Facing South  (800x600).jpg Installed conduit at the steel columns (2nd Floor) Facing West (800x600).jpg Installed conduit Facing South (800x600).jpg Installed rebar at the pour stops around the 2nd floor Facing East (800x600).jpg